| Workpiece and Capacity | Confirm the machine’s supported pipe or tube outside diameters, wall thicknesses, material types, and required end-forming operations. | Compare the published capacity limits with the actual parts and materials in your production plan. Ask for a trial using representative workpieces. | The intended sizes and materials are within the machine’s stated operating range, and the trial produces parts that meet drawing requirements. |
| Forming Quality and Repeatability | Review dimensional consistency, surface condition, concentricity, and the ability to repeat the required swaged profile across production runs. | Inspect sample parts and measurement results. Where suitable, request results from repeated cycles using the same material, tooling, and settings. | Samples meet the relevant tolerances and show no unacceptable cracking, wrinkling, excessive marking, or deformation. |
| Machine Reliability | Assess the frame, drive system, controls, protective devices, and the suitability of the machine for the expected duty cycle and operating environment. | Request operating and service documentation, warranty terms, and details of any available reliability or endurance test information. Verify safety features during inspection. | The machine is specified for the planned workload, is built for the intended environment, and includes appropriate guarding and operating instructions. |
| Tooling and Changeover | Check the availability and compatibility of dies, mandrels, clamps, and other tooling needed for the required pipe sizes and profiles. | Confirm tooling specifications, changeover instructions, tool-life guidance, and whether setup can be completed safely and consistently. | Required tooling is available, securely fits the machine, and can be changed and set up without unnecessary production delays. |
| Maintenance and Spare Parts | Review routine inspection points, lubrication requirements, hydraulic or mechanical service needs, wear parts, and access to replacement components. | Ask for a maintenance schedule, parts list, troubleshooting guide, and details on spare-part availability and typical ordering arrangements. | Maintenance tasks are clearly documented, essential parts can be identified, and service access is practical for the plant’s maintenance team. |
| Supplier Training and Technical Support | Evaluate installation assistance, operator and maintenance training, troubleshooting support, and access to qualified service personnel. | Confirm what support is included, how support requests are handled, available training formats, and the scope of commissioning assistance. | Responsibilities and support arrangements are stated clearly, and the supplier can explain how operators will be trained and service issues addressed. |
| Safety and Documentation | Check guarding, emergency-stop arrangements, safe work procedures, electrical documentation, and risk information relevant to the machine’s intended use. | Review the operating manual, safety instructions, electrical drawings, and applicable conformity or risk-assessment documentation for the destination market. | Documentation is complete and understandable, and the machine’s safeguards are appropriate for its intended operation and workplace requirements. |